The Point at River
Shores
West Bend, WI
Shores
West Bend, WI
This project represents an innovative approach to the adaptive re-use of an existing industrial building. The original office building of the sprawling former West Bend Company occupied a prime riverfront location.
As part of the design solution, we removed the top floor of the existing three-story 1950’s building and converted the remaining concrete structure to enclosed parking. A green roof reduces stormwater runoff and provides an attractive gathering space for residents.
To create 30 luxury apartments, a new outer skin was added to the existing structure. This design scheme brought each condominium unit closer to the water and created more value to the overall project.
As part of the design solution, we removed the top floor of the existing three-story 1950’s building and converted the remaining concrete structure to enclosed parking. A green roof reduces stormwater runoff and provides an attractive gathering space for residents.
To create 30 luxury apartments, a new outer skin was added to the existing structure. This design scheme brought each condominium unit closer to the water and created more value to the overall project.
